Getting Closer – October 2012
Friday was an exciting day as we watched the sign go up at EPR Automotive. That made it officially seem real.
As of today, everything has been delivered and unpacked and about 80% of the equipment and machinery has been assembled. Two lifts will be fully operational by the end of the day tomorrow and the third (alignment rack) should be by Wednesday.
Below are some photos of the last few days … unloading, assembling, building.
And after a tough day today (ran into some problems with assembly of the alignment rack), a visit from the kids brought a smile to my face. They are loving all the boxes they have to play with lately!
Comments for this post are closed.